How are house containers waterproofed?
2023-02-06 00:50:45

1. Application of flexible waterproof layer

You can choose paint or coiled material. The waterproof construction conditions of House Containers require that the moisture content of the base surface should not exceed 9%, which is suitable for construction on hot and sunny days; construction in summer after the sun. After completion, a water storage test should be carried out.

2. Such as waterproof coating

Take "one canvas with two coats" as an example: after cleaning the primer, apply a full layer of paint, after drying to form a film, apply a layer of glass fiber fabric matrix reinforcement material, and apply a full layer of paint on top of the primer. Fix the surface on a flat surface, and proceed to the next roof waterproofing construction after drying.


house container


3. Such as the construction of waterproof membrane

After cleaning the base layer, use a brush to apply adhesive glue on the back of the coil and the base layer, paste and roll from far to near according to the elastic reference line, and then check the end of the sewing.

4. The second waterproof layer of waterproof roof construction

When laying the rigid waterproof layer, it should be constructed about two days after the completion of the flexible waterproof layer. The base material is mainly fatty acid mortar waterproofing agent, cement, sand, fine stone aggregate and fiber. The thickness of the waterproof layer should be 20-30mm.


Aiheeseen liittyvät tunnisteet: Hook Lift Containers Roll Off Containers

Kommentti

(0)

Leave us your message

Contact you as soon as you receive the message
*sisältö:
Nimi
Puhelin:

Key Words

Follow Us

osoite:
Fax:0086-514-87469905
Mail:sale@heroeq.com
CONTACT US
Call Us
0086-514-87582899
kaikki oikeudet pidätetään ©
Puhelin:
0086-514-87582899
osoite: