Direct burial refers to the direct burial of sanitation products such as garbage bins and fruit Mild Steel Bins. During the production process, a certain length is usually reserved at the bottom, square tubes or sheet metal parts, which are designed according to the style of the garbage bin or customer requirements. ;The reserved length will be buried directly on the mud or cement ground.
Pre-embedded refers to pre-embedded components that are buried before the concrete is poured and tamped. The components are generally composed of metals such as steel bars or square pipes. The buried components will reserve parts connected to sanitation products, screws or expansion screw holes on the upper layer of concrete. After the cement floor is dry, the dustbin can be fixed on it.
Expansion screw fixing refers to the use of expansion screws to link products such as recycling bins or smart garbage Mild Steel Bins. This fixing method requires the cement floor to be poured first, and the cement floor needs to be completely dry. This installation method is more flexible than pre-embedding, as long as it is a cement floor, it can be fixed and placed. This fixing method is widely used in sanitation products.
Direct delivery means that after the garbage can is placed in a fixed place, it only needs to be placed on a fixed location, and no other operations are required. This method is generally suitable for large garbage cans in garbage rooms, etc., and it needs to have a certain weight. The kind that is easily blown away by the wind. The method of direct delivery is widely used indoors, and this method is used in indoor Mild Steel Bins.
The installation method of garbage collection is not fixed. This needs to be designed in different styles according to the style, weight, and site of use of the product.